儲液槽英語怎麼說及英語單詞
1. 我要英語翻譯
在應用了高壓水沙破裂法的低滲透的儲液槽效率很差,這在許多文獻上都有所提及(1975年的內Tannich,1993年的Liao and Lee,1985年的Abrams and Vinegar)。在容操作過程中液體侵入和泄露都可能降低生產率。
2. 翻譯為英文
Project number provided
Number of ways
A pre-treatment spray
L28400 × W1200 × H3800 (mm) HDTZ 1 sets
A spray chamber body of a Taiwan
2, 9, Taiwan Liquid Tank
3 spray pumps and piping 9 sets
4 exhaust pipe 2 sets of machines and
5 phosphate precipitation Tower 1 units
6 heat sink body of a Taiwan
7, 2 sets of plate heat exchanger tank
8 groove plate heat exchanger 1 set
9, 10 sets of nozzles
10 sets of 10 spray pipe
10 sets of 11 valve flange
1 set of 12 phosphate replacement pump
1 set of 13 hot water circulating pump
14, 1 set of glass fiber reinforced plastic anticorrosion material
15 2 sets of lighting
16 access door and platform 1 set
1 set of 17 automatic degreasing system
1 set of 18 other supporting materials
Two electrophoretic systems HDTZ 1 sets
1 main channel and sub-slot electrophoresis
L8600 × W1300 × H1700 (mm) 1 sets
After the washing chamber 2 swimming body (stainless steel) 1
2 sets of 3 spray pump
2 sets of 4 Spray Liquid Tank
Exhaust Fan and pipe 1 5 sets
6 Rectifier 250V/250A 1 Taiwan
7, plate heat exchanger (20m2) 1 station
8 chillers (100,000 kcal)
(Pumps, piping and valves) 1 set
9 1 station cooling tower
10 water units (1.5T / H)
(RO type) 1
11 ultrafiltration device
(1T / H) 1 set
Cover a set of 12 cathode
13 2 sets of swimming paint filter
After the sprinkler system 14 5 sets of swimming
The main circulation line 15 Red paint 1 set
16 Red paint the main circulating pump DN100 2 sets
1 set of 17 paint device
18 water pumps installed for other
1 set of auxiliary platform 19 electrophoresis
1 set of 20 maintenance platform
21, 1 set of glass fiber reinforced plastic anticorrosion material
1 set of 22 other supporting materials
3 curtain spray booth
L2500 × W2400 × H2600 (mm) HDTZ 4 sets
A spray chamber body 4 sets
2, 4 sets of operating room body
4 sets of 3 Liquid Tank
4 sets of 4 fluid filter
5 curtain device (stainless steel) 4 sets
6, 4 sets of water pumps and piping
7, exhaust fan and the pipe 2 sets
4 sets of 8-retaining flap
9, 4 sets of spray capture device
4 sets of 10 lighting fixtures
4 rack units of 11 sets of wind
4 sets of 12 pipe flange valve
4 sets of 13 st-proof room
4 sets of 14 other supporting materials
Four electrophoretic paint drying furnace
L24500 × W2300 × H2400 (mm) HDTZ 1 sets
1 room 1 unit body
2 sets 1 set
3 hot air circulation fan 1 set
1 set of 4 rock wool insulation
1 set of hot air circulation line 5
6 days gas heater 1 set
7, 1 set of exhaust emission devices
1 set of 8 other support materials
Five paint drying oven
L19500 × W2300 × H2400 (mm) HDTZ 1 sets
6 leveling Room HDTZ 2 sets
1 room 2 sets of body
2 2 sets of exhaust emission devices
3, access door and viewing window 2 sets
7 conveyor (XT100 type) 1 set of Suzhou
A removable chain of about 260m Die
2 250m track
3, drives a station
4 tension device 1 set
5 Furnace 1 set of telescopic rail
6 including 1 set of rack
Seven sets 1 set
8 in 1 set of curved track
9 on track one set of curved arch
10 curved track a set of Bending
1 set of 11 rotating device
1 set of 12 frequency converter
13 slide rack installed for the load
14 empty slide rack installed for
1 set of 15 column
1 set of 16 other supporting materials
Eight sets of electrical control system HDTZ 2
1 pre-treatment spray control cabinet 2 sets
2 2 sets of oven control cabinet
3 hanging chain and spray control cabinet 2 sets
4 CED control cabinet 1 set
5 Department of wire cable tray 1 set
Nine sewage treatment equipment (5m3 / h) 1 sets
10 4 sets of manual painting systems
11 10% spare parts (2 years 3 classes)
12 fire appliances and common tool used
13 Backup Power 50KW 1-Taiwan
14 raw materials for debugging
15 1 set of instrumentation
16 handling equipment, travel,
Forklift and handling equipment
Subtotal
17 design fee
18 Commissioning costs of Installation
19 staff training costs
20 freight (domestic)
The total project cost (capital) ¥:
3. 求翻譯 急需!!!!
First、Overview
System mainly have testing rooms, exhaust system, workpiece hoisting system, workstations, cleaning system, wastewater recycling and disposal system etc. The system adopts closed work room structure, which can effectively prevent harmful gas and st on the workshop cause pollution; At the same time also is equipped with wastewater recycling and disposal system, ensure sewage discharge conforms to the national environmental protection requirement.
Second、 detection room
2.1, main structure:
Testing room USES overall sealing structure. Integral structure using stainless steel square tubes as a scaffold, all around and top made of stainless steel plate making, is beautiful and strong, no corrosion. Stainless steel material all adopts 304 high-quality stainless steel.
Room inside for layer material 304 stainless steel board, outer materials for ivory plastic plate, intermediate clip 50 thick retardant materials.
2.2, security:
Anterior equipped with two fan draw sliding door, with convenient working personnel and workpiece car in. Opening-closing door specifications for: wide 1.25 m (2 fan) x 2.2 m high. Push-pull using standard linear guide rail, ensure the push-pull easily; Testing room south design specification of a fan, safety door: wide 800mm * 2000mm, high safety door adopt open well-formed structure, from inside to outside open, ensure an emergency operation personnel evacuated.
2.3 lighting system:
Testing the roof with four sets of explosion-proof al pipe, ensure floodlight distance ground 0.8 m high place lighting light intensity of illumination or less than 1000Lux (lux).
2.4, exhaust system:
Testing room rear with exhaust pipe and exhaust device 2 sets. Exhaust pipe from testing room through the wall, exhaust device installed in the wall outside. Exhaust with automatic timer intervals, ensure every 15 minutes exhaust ventilation once. Testing room equipped with 2, 2 sides with filter device, ensure no st into the air.
2.5, cleaning system:
The room is equipped with a flaw Karcher high pressure cleaner, with convenient workpieces cleaning. High pressure cleaner of specifications for: 698C HDS retail. 698C HDS retail for economic three-phase electricity, compact cold and hot water high pressure cleaner. Simple, easy to control a key manipulation, chassis integrated tanks and detergent box, make the machine light weight and impact resistance, no corrosion and also rece working noise.
Equipped with the following equipment: 1. With soft cushion servo gun effortless type, 2. 10 meters high pressure pipe, 3. Can rotate 1050mm long stainless steel spray gun pole, 4. Strong nozzle, SDS damping system; 5. 6. The fuel gas temperature monitor.
2.6, liquid collection and processing system:
Operating venue ground design whole set liquid trough, collecting liquid trough specifications for 5100mm x x 4100mm 100mm. Collecting liquid trough high-bright galvanized pedal grille board, grille board specifications for 5060mm x 4060mm x 50, grille board intervals for 30mm x 40mm size. The entire testing room placed in overall collecting liquid groove, collecting liquid trough set drainage pipe leads to the workshop outside the wall, keep wastewater to discharge waste water reservoir liquid trough.
2.7, workpiece hoisting and transport system:
Testing room equipped with two transport vehicles, specification of workpiece 600mm x x 700mm 1200mm. Transshipment car made of stainless steel. Maximum load-bearing 2000Kg car.
我也不知道翻譯的怎麼樣。麻煩下次再說請別人翻譯的時候,說清楚要翻譯的語言,我只會英語就幫你翻譯成英語了...
4. 哈爾濱工業大學學生痴迷數學20年沒人認可,你怎麼看
【首屆「招辦主任光明大直播」】
光明日報記者趙洪波張士英
■招辦主任話招生
6月23日下午4時,由光明日報、光明網記者組成的首屆「招辦主任光明大直播」團隊走進哈爾濱工業大學。
「在這里,你會觸碰最前沿的科技、加入把衛星送上天的最牛學生團隊、烙上『規格嚴格,功夫到家』的校訓印記,會有不一樣的未來。」直播中,哈爾濱工業大學招辦主任邢朝霞的推介打動了很多網友。
歷時兩小時的直播,光明日報客戶端、光明網微博(一直播)兩個平台直播總觀看量14萬人次,留言互動1600餘條。
光明網主播采訪哈爾濱工業大學招辦主任邢朝霞。楊煜攝/光明圖片
工科實力強
哈爾濱工業大學是一所理工為主,理、工、管、文、經、法等多學科協調發展的重點大學,學校工科實力都非常強,哈工大有9個國家一級學科,其中8個是工科。
在教育部第三輪學科的評估中,哈工大力學學科名列榜首,19個國家重點一級學科進入全國前10名,10個一級學科進入全國前5名,在工科類學科中,進入前5名的數量居全國第2位。工程學學科進入ESI全球前萬分之一行列,成為我國擁有全球前萬分之一學科的3所高校之一。
航天特色突出
從哈爾濱工業大學航空工程繫到中國第一所以培養高級航天專門人才和從事航天高技術研究為主的航天學院,哈工大形成了多個學院、多個學科相互融合服務國家航天事業的「大航天」格局。
哈工大幾萬名優秀畢業生默默奉獻在中國航天領域,學校近百項科研成果應用到載人航天和繞月探測工程。
本碩(博)貫通的人才培養
哈工大實行本碩(博)貫通、過程分流的培養模式,即被推薦免試的學生,第四年的課程與碩士課程統籌規劃。在碩士研究生一年級時,條件符合要求的學生可進入碩博直通學習,免試攻讀博士學位。致力於培養基礎扎實、實踐能力強、具有國際競爭力的創新人才。
■學校名片
歷史厚重:哈爾濱工業大學,始建於1920年,是全國學習國外高等教育辦學模式的兩所樣板大學之一,是我國首批重點建設的6所高校中唯一一所京外高校,也是我國首批進入國家「211」「985」重點建設的9所大學之一。
人才輩出:學校培養出國家最高科學技術獎獲得者、「兩彈一星」功勛科學家之一孫家棟等一大批航天國防英才,培養出了上海交通大學原校長范緒箕、清華大學焊接專業創始人潘際鑾等100多位大學校長、80多位兩院院士,以及一批產業精英。
《光明日報》(2017年06月24日06版)
5. 幫忙翻譯成英文
4, device structure shows
a, the system consists of 10 processing station, three sets of heating devices, emission devices, and manual and automatic temperature control, electronically controlled automatic spray composed of co-washing machine.
b, unit structure of the chamber body, tank, pumps, valves, piping, nozzles, insulation and ventilation system, etc..
c, room spray body design is divided into paragraphs and transition, with anti-series between the Dan liquid baffle, similar processes with the adjacent water washing up against the technology, from the washing process ensures the effectiveness and save water. Spray pre-treatment units to eliminate entire run, run, drop, leakage and so on.
d, spray chamber body through all the pre-treatment station, the entire room with 1.2mm stainless steel proction body. The frame is square tube proction, heat insulation structure section are used, insulation board is 0.8mm stainless steel jacket.
e, tank 3.0mm thick stainless steel plate. All tanks are heating section heat treatment, insulation thickness 50mm, high quality rock wool insulation panels, insulation layer 0.8mm stainless steel jacket.
f, Liquid Tank main body design, the Deputy slot structure and cover in the slot and the slot located between the water seal device, set the upper sump overflow ports and water supply port, bottom tilt and stainless steel with double-layer filter, to prevent debris into the pump. The lowest position in the tank equipped with a discharge valve.
g, the nozzle using the new nozzle, which is characterized by the direction adjustable, quick loading and unloading, the material is PP, which uses a spiral spray-type phosphate special nozzles, with the impact of small, uniform coating, and the remaining processes are used in paragraph SUPER VPZ cleaning nozzle.
h, with inspection door and check the repair platform, escalator, convenience checks and maintenance.
i, temperature control system, using a manual temperature control and automatic control and automatic heating, heating equipment, the normal time of 1.5 hours to process temperature.
j, heating system: the steam solenoid valves, heaters, valves and piping and other components.
Degreasing bath heated corrugated plate heat exchangers are used directly to heat the steam. Phosphating Bath tank heating with indirect steam heating plate heat exchanger, or steam through the plate heat exchanger to heat the water heating tank, then water as a heat carrier through the heat exchanger of the phosphate groove of Bath heating, indirect heating method particularly suitable for heating phosphate bath, which can heat the temperature control bath below 45 ℃, avoid direct steam heating, the bath temperature by the heat exchanger surface, the impact of changes in chemical properties and effective concentration.
All heating tank bath temperature control are used temperature sensor, digital temperature controller, automatic control valve to change the steam heat exchanger and heat exchange capacity can be realized.
k, the top exports and imports both rooms lead to outdoor ventilation system to spill water vapor, while the subsequent removal of blowing steam phosphating solution, ensure that the jobs in the rust before phosphating, the top of the catenary in the room to run open body Department has a hanging chain guard.
l, phosphate slag method using phosphate dark tower, trough concentration, reciprocating pumps etc., Phosphating Phosphating precipitation through the pump hit the tower, the phosphating solution in the phosphate precipitation in the tangent direction to the tower, the upper clear solution phosphating tank overflow back, slide into the bottom of lower phosphate slag, and condensed regular discharge slot in the pipeline with compressed air device (used to clean blocked pipes phosphate resie), located sedimentation tower for the phosphate reserve tank This slot should be slightly larger than the phosphate groove.
m, units are used pipe water pump vertical pump, intake pipe, with discharge valve, other valves with butterfly valves.
n, all the pumps are all made of domestic brand-name manufacturers, all of the infusion tube of stainless steel connections, spray up and down the same pressure to achieve the best cleaning results.