Project number provided
Number of ways
A pre-treatment spray
L28400 × W1200 × H3800 (mm) HDTZ 1 sets
A spray chamber body of a Taiwan
2, 9, Taiwan Liquid Tank
3 spray pumps and piping 9 sets
4 exhaust pipe 2 sets of machines and
5 phosphate precipitation Tower 1 units
6 heat sink body of a Taiwan
7, 2 sets of plate heat exchanger tank
8 groove plate heat exchanger 1 set
9, 10 sets of nozzles
10 sets of 10 spray pipe
10 sets of 11 valve flange
1 set of 12 phosphate replacement pump
1 set of 13 hot water circulating pump
14, 1 set of glass fiber reinforced plastic anticorrosion material
15 2 sets of lighting
16 access door and platform 1 set
1 set of 17 automatic degreasing system
1 set of 18 other supporting materials
Two electrophoretic systems HDTZ 1 sets
1 main channel and sub-slot electrophoresis
L8600 × W1300 × H1700 (mm) 1 sets
After the washing chamber 2 swimming body (stainless steel) 1
2 sets of 3 spray pump
2 sets of 4 Spray Liquid Tank
Exhaust Fan and pipe 1 5 sets
6 Rectifier 250V/250A 1 Taiwan
7, plate heat exchanger (20m2) 1 station
8 chillers (100,000 kcal)
(Pumps, piping and valves) 1 set
9 1 station cooling tower
10 water units (1.5T / H)
(RO type) 1
11 ultrafiltration device
(1T / H) 1 set
Cover a set of 12 cathode
13 2 sets of swimming paint filter
After the sprinkler system 14 5 sets of swimming
The main circulation line 15 Red paint 1 set
16 Red paint the main circulating pump DN100 2 sets
1 set of 17 paint device
18 water pumps installed for other
1 set of auxiliary platform 19 electrophoresis
1 set of 20 maintenance platform
21, 1 set of glass fiber reinforced plastic anticorrosion material
1 set of 22 other supporting materials
3 curtain spray booth
L2500 × W2400 × H2600 (mm) HDTZ 4 sets
A spray chamber body 4 sets
2, 4 sets of operating room body
4 sets of 3 Liquid Tank
4 sets of 4 fluid filter
5 curtain device (stainless steel) 4 sets
6, 4 sets of water pumps and piping
7, exhaust fan and the pipe 2 sets
4 sets of 8-retaining flap
9, 4 sets of spray capture device
4 sets of 10 lighting fixtures
4 rack units of 11 sets of wind
4 sets of 12 pipe flange valve
4 sets of 13 st-proof room
4 sets of 14 other supporting materials
Four electrophoretic paint drying furnace
L24500 × W2300 × H2400 (mm) HDTZ 1 sets
1 room 1 unit body
2 sets 1 set
3 hot air circulation fan 1 set
1 set of 4 rock wool insulation
1 set of hot air circulation line 5
6 days gas heater 1 set
7, 1 set of exhaust emission devices
1 set of 8 other support materials
Five paint drying oven
L19500 × W2300 × H2400 (mm) HDTZ 1 sets
6 leveling Room HDTZ 2 sets
1 room 2 sets of body
2 2 sets of exhaust emission devices
3, access door and viewing window 2 sets
7 conveyor (XT100 type) 1 set of Suzhou
A removable chain of about 260m Die
2 250m track
3, drives a station
4 tension device 1 set
5 Furnace 1 set of telescopic rail
6 including 1 set of rack
Seven sets 1 set
8 in 1 set of curved track
9 on track one set of curved arch
10 curved track a set of Bending
1 set of 11 rotating device
1 set of 12 frequency converter
13 slide rack installed for the load
14 empty slide rack installed for
1 set of 15 column
1 set of 16 other supporting materials
Eight sets of electrical control system HDTZ 2
1 pre-treatment spray control cabinet 2 sets
2 2 sets of oven control cabinet
3 hanging chain and spray control cabinet 2 sets
4 CED control cabinet 1 set
5 Department of wire cable tray 1 set
Nine sewage treatment equipment (5m3 / h) 1 sets
10 4 sets of manual painting systems
11 10% spare parts (2 years 3 classes)
12 fire appliances and common tool used
13 Backup Power 50KW 1-Taiwan
14 raw materials for debugging
15 1 set of instrumentation
16 handling equipment, travel,
Forklift and handling equipment
Subtotal
17 design fee
18 Commissioning costs of Installation
19 staff training costs
20 freight (domestic)
The total project cost (capital) ¥:
3. 求翻译 急需!!!!
First、Overview
System mainly have testing rooms, exhaust system, workpiece hoisting system, workstations, cleaning system, wastewater recycling and disposal system etc. The system adopts closed work room structure, which can effectively prevent harmful gas and st on the workshop cause pollution; At the same time also is equipped with wastewater recycling and disposal system, ensure sewage discharge conforms to the national environmental protection requirement.
Second、 detection room
2.1, main structure:
Testing room USES overall sealing structure. Integral structure using stainless steel square tubes as a scaffold, all around and top made of stainless steel plate making, is beautiful and strong, no corrosion. Stainless steel material all adopts 304 high-quality stainless steel.
Room inside for layer material 304 stainless steel board, outer materials for ivory plastic plate, intermediate clip 50 thick retardant materials.
2.2, security:
Anterior equipped with two fan draw sliding door, with convenient working personnel and workpiece car in. Opening-closing door specifications for: wide 1.25 m (2 fan) x 2.2 m high. Push-pull using standard linear guide rail, ensure the push-pull easily; Testing room south design specification of a fan, safety door: wide 800mm * 2000mm, high safety door adopt open well-formed structure, from inside to outside open, ensure an emergency operation personnel evacuated.
2.3 lighting system:
Testing the roof with four sets of explosion-proof al pipe, ensure floodlight distance ground 0.8 m high place lighting light intensity of illumination or less than 1000Lux (lux).
2.4, exhaust system:
Testing room rear with exhaust pipe and exhaust device 2 sets. Exhaust pipe from testing room through the wall, exhaust device installed in the wall outside. Exhaust with automatic timer intervals, ensure every 15 minutes exhaust ventilation once. Testing room equipped with 2, 2 sides with filter device, ensure no st into the air.
2.5, cleaning system:
The room is equipped with a flaw Karcher high pressure cleaner, with convenient workpieces cleaning. High pressure cleaner of specifications for: 698C HDS retail. 698C HDS retail for economic three-phase electricity, compact cold and hot water high pressure cleaner. Simple, easy to control a key manipulation, chassis integrated tanks and detergent box, make the machine light weight and impact resistance, no corrosion and also rece working noise.
Equipped with the following equipment: 1. With soft cushion servo gun effortless type, 2. 10 meters high pressure pipe, 3. Can rotate 1050mm long stainless steel spray gun pole, 4. Strong nozzle, SDS damping system; 5. 6. The fuel gas temperature monitor.
2.6, liquid collection and processing system:
Operating venue ground design whole set liquid trough, collecting liquid trough specifications for 5100mm x x 4100mm 100mm. Collecting liquid trough high-bright galvanized pedal grille board, grille board specifications for 5060mm x 4060mm x 50, grille board intervals for 30mm x 40mm size. The entire testing room placed in overall collecting liquid groove, collecting liquid trough set drainage pipe leads to the workshop outside the wall, keep wastewater to discharge waste water reservoir liquid trough.
2.7, workpiece hoisting and transport system:
Testing room equipped with two transport vehicles, specification of workpiece 600mm x x 700mm 1200mm. Transshipment car made of stainless steel. Maximum load-bearing 2000Kg car.
我也不知道翻译的怎么样。麻烦下次再说请别人翻译的时候,说清楚要翻译的语言,我只会英语就帮你翻译成英语了...
4. 哈尔滨工业大学学生痴迷数学20年没人认可,你怎么看
【首届“招办主任光明大直播”】
光明日报记者赵洪波张士英
■招办主任话招生
6月23日下午4时,由光明日报、光明网记者组成的首届“招办主任光明大直播”团队走进哈尔滨工业大学。
“在这里,你会触碰最前沿的科技、加入把卫星送上天的最牛学生团队、烙上‘规格严格,功夫到家’的校训印记,会有不一样的未来。”直播中,哈尔滨工业大学招办主任邢朝霞的推介打动了很多网友。
历时两小时的直播,光明日报客户端、光明网微博(一直播)两个平台直播总观看量14万人次,留言互动1600余条。
光明网主播采访哈尔滨工业大学招办主任邢朝霞。杨煜摄/光明图片
工科实力强
哈尔滨工业大学是一所理工为主,理、工、管、文、经、法等多学科协调发展的重点大学,学校工科实力都非常强,哈工大有9个国家一级学科,其中8个是工科。
在教育部第三轮学科的评估中,哈工大力学学科名列榜首,19个国家重点一级学科进入全国前10名,10个一级学科进入全国前5名,在工科类学科中,进入前5名的数量居全国第2位。工程学学科进入ESI全球前万分之一行列,成为我国拥有全球前万分之一学科的3所高校之一。
航天特色突出
从哈尔滨工业大学航空工程系到中国第一所以培养高级航天专门人才和从事航天高技术研究为主的航天学院,哈工大形成了多个学院、多个学科相互融合服务国家航天事业的“大航天”格局。
哈工大几万名优秀毕业生默默奉献在中国航天领域,学校近百项科研成果应用到载人航天和绕月探测工程。
本硕(博)贯通的人才培养
哈工大实行本硕(博)贯通、过程分流的培养模式,即被推荐免试的学生,第四年的课程与硕士课程统筹规划。在硕士研究生一年级时,条件符合要求的学生可进入硕博直通学习,免试攻读博士学位。致力于培养基础扎实、实践能力强、具有国际竞争力的创新人才。
■学校名片
历史厚重:哈尔滨工业大学,始建于1920年,是全国学习国外高等教育办学模式的两所样板大学之一,是我国首批重点建设的6所高校中唯一一所京外高校,也是我国首批进入国家“211”“985”重点建设的9所大学之一。
人才辈出:学校培养出国家最高科学技术奖获得者、“两弹一星”功勋科学家之一孙家栋等一大批航天国防英才,培养出了上海交通大学原校长范绪箕、清华大学焊接专业创始人潘际銮等100多位大学校长、80多位两院院士,以及一批产业精英。
《光明日报》(2017年06月24日06版)
5. 帮忙翻译成英文
4, device structure shows
a, the system consists of 10 processing station, three sets of heating devices, emission devices, and manual and automatic temperature control, electronically controlled automatic spray composed of co-washing machine.
b, unit structure of the chamber body, tank, pumps, valves, piping, nozzles, insulation and ventilation system, etc..
c, room spray body design is divided into paragraphs and transition, with anti-series between the Dan liquid baffle, similar processes with the adjacent water washing up against the technology, from the washing process ensures the effectiveness and save water. Spray pre-treatment units to eliminate entire run, run, drop, leakage and so on.
d, spray chamber body through all the pre-treatment station, the entire room with 1.2mm stainless steel proction body. The frame is square tube proction, heat insulation structure section are used, insulation board is 0.8mm stainless steel jacket.
e, tank 3.0mm thick stainless steel plate. All tanks are heating section heat treatment, insulation thickness 50mm, high quality rock wool insulation panels, insulation layer 0.8mm stainless steel jacket.
f, Liquid Tank main body design, the Deputy slot structure and cover in the slot and the slot located between the water seal device, set the upper sump overflow ports and water supply port, bottom tilt and stainless steel with double-layer filter, to prevent debris into the pump. The lowest position in the tank equipped with a discharge valve.
g, the nozzle using the new nozzle, which is characterized by the direction adjustable, quick loading and unloading, the material is PP, which uses a spiral spray-type phosphate special nozzles, with the impact of small, uniform coating, and the remaining processes are used in paragraph SUPER VPZ cleaning nozzle.
h, with inspection door and check the repair platform, escalator, convenience checks and maintenance.
i, temperature control system, using a manual temperature control and automatic control and automatic heating, heating equipment, the normal time of 1.5 hours to process temperature.
j, heating system: the steam solenoid valves, heaters, valves and piping and other components.
Degreasing bath heated corrugated plate heat exchangers are used directly to heat the steam. Phosphating Bath tank heating with indirect steam heating plate heat exchanger, or steam through the plate heat exchanger to heat the water heating tank, then water as a heat carrier through the heat exchanger of the phosphate groove of Bath heating, indirect heating method particularly suitable for heating phosphate bath, which can heat the temperature control bath below 45 ℃, avoid direct steam heating, the bath temperature by the heat exchanger surface, the impact of changes in chemical properties and effective concentration.
All heating tank bath temperature control are used temperature sensor, digital temperature controller, automatic control valve to change the steam heat exchanger and heat exchange capacity can be realized.
k, the top exports and imports both rooms lead to outdoor ventilation system to spill water vapor, while the subsequent removal of blowing steam phosphating solution, ensure that the jobs in the rust before phosphating, the top of the catenary in the room to run open body Department has a hanging chain guard.
l, phosphate slag method using phosphate dark tower, trough concentration, reciprocating pumps etc., Phosphating Phosphating precipitation through the pump hit the tower, the phosphating solution in the phosphate precipitation in the tangent direction to the tower, the upper clear solution phosphating tank overflow back, slide into the bottom of lower phosphate slag, and condensed regular discharge slot in the pipeline with compressed air device (used to clean blocked pipes phosphate resie), located sedimentation tower for the phosphate reserve tank This slot should be slightly larger than the phosphate groove.
m, units are used pipe water pump vertical pump, intake pipe, with discharge valve, other valves with butterfly valves.
n, all the pumps are all made of domestic brand-name manufacturers, all of the infusion tube of stainless steel connections, spray up and down the same pressure to achieve the best cleaning results.